Corporate
GEA corporate video
10 views
Big things start with the details, a small change can have a huge impact. The video tells the story of how GEA can design and build a complete dairy plant from a greenfield site. The Fonterra Darfield plant was completed in 2013 and at the time was the largest milk powder spray drying plant in the world. Each plant centres around the large 30 tonnes per hour drying chamber – the largest such dryers in the world.